Construction and design of transmission
line 35(20) kV from SHPP Sućeska R-S-2 to switchboard station 35/20/10 kV Kovači, TS 110/20/10 kV Goražde 2, supply and installation
– ERS male hidroelektrane d.o.o.
juli 2011-jan. 2012
Construction of LV and MV network, municipality Višegrad, Resnik
– Fond za povratak BiH
april 2013
Construction of DV 35 kV from SHPP Oteša to transformer station 35/10/0,4 kV Miljevina, supply and installation
– Oteša male hidroelektrane d.o.o.
2013
Construction of transmission line 10 kV, construction of transformer station TS 10/0,4 kV and construction of low voltage network for company Novi rudnik mrkog uglja Miljevina
– Novi rudnik mrkog uglja Miljevina
sep.-okt. 2014
Construction of 110 kV transmission line for connection to the electricity network
– Hidroinvest d.o.o.
jan.-maj 2015
Construction of DV 35 kV Ugljevik - Priboj, with supply and installation of materials
– ZEDP Elektro Bijeljina
jan.-juli 2015
Design and construction of 35 kV transmission line to connection on power grid, installed power 1 MW
– Elektro Jovana d.o.o.
mart 2016
Construction of transmission line 35 kV from SHPP Govza 1 to TS 35/10/0,4 kV Miljevina, supply and installation
– Elektros d.o.o.
mart-maj 2016
Construction of 35 kV transmission line to connect: power grid - SHPP Do, installed power 2 MW
– Strajko d.o.o.
maj 2016
Construction of 10(20) kV underground cable transmission line, supply and installition of medium voltage block, construction of low voltage and optical connection: powerhouse – water intake SHPP Krupica
– Krupica d.o.o.
avg.-nov. 2016
Design and construction of transmission line 35 kV, length approx. 8000 m, construction of LV and optical connection: power house-water intake SHPP Podivič
– Buk d.o.o.
maj-nov. 2017
Design and construction of 10(20) kV transmission line, length approx. 580 m, SHPP Preliv
– Credo Invest d.o.o.
apr.-juni 2018
Design and construction of 35 kV transmission line, SHPP Medoš-TS Kamenica, length approx. 9 km