Construction of gondola on mountain Jahorina

Lenght: 1100 meters 

Departure station, garage, arrival station

Functional tests and commissioning

Low voltage and optical connection departure-arrival

Design and construction of 35 kV power line

MHE Medoš

Access road for power line construction 

Construction of 10(20) kV power line for transformer station TS 10(20)/0,4 kV, 400 kVA powerhouse - intake 10(20)/0,4 kV

Construction of optical connection powerhouse-intake

Design and construction of bridge LED light

bridge 9. May

Power line for bridge light - lenght: 2000 m

Installation of 122 light fixtures

Design and construction of SHPP Krupica

Design and construction of powerhouse and intake  

Supply and installation of hydromechanical and electro equipment

Low voltage and optical connection powerhouse-intake

Functional tests and commissioning

Design and construction of 35 KV power line

SHPP RS2 - transformer station Kopači

Power line lenght: 17,5 km

Power plant managment and commissioning

Design and construction of SHPP B-O-2, "Turn key" principle

Construction of access roads

Design and construction of powerhouse and intake

Construction of optical connection powerhouse-intake

lenght: 3900 m

Functional tests and commissioning