HYDROPOWER – reference

  • Design and construction "Turn Key" principle, SHPP OTEŠA B-O-2 installed power: 992 kW, Oteša river
  • Design and construction "Turn Key" principle, SHPP Krupica B-K-1 installed power: 992 kW, Krupica river
  • Design and construction "Turn Key" principle, SHPP Kosova installed power: 992 kW, Kosova river
  • Projektovanje i izgradnja po principu “ključ u ruke”  MHE Podivič instalisana snaga: 1000 kW, Kasindolska rijeka
  • Design and construction "Turn Key" principle, SHPP Preliv installed power: 250 kW, Vrelo river

HYDROPOWER

  • Design and construction "Turn Key" principle, SHPP OTEŠA B-O-2 installed power: 992 kW, Oteša river

– MHE Oteša male hidroelektrane

2013

  • Design and construction "Turn Key" principle, SHPP Krupica B-K-1 installed power: 992 kW, Krupica river

– SIMING/Konstruktor d.o.o. 

2016

  • Design and construction "Turn Key" principle, SHPP Kosova installed power: 992 kW, Kosova river

– SIMING/Konstruktor d.o.o. 

2016

  • Design and construction "Turn Key" principle, SHPP Podivič, installed power: 1 MW, Kasindol river

– Buk d.o.o. 

2018

  • Design and construction "Turn Key" principle, SHPP Preliv installed power: 250 kW, Vrelo river

– Credo Invest d.o.o. 

2018

error: Content is protected !!